Differences between revisions 7 and 8
Revision 7 as of 2010-01-07 18:48:51
Size: 1404
Editor: anderson-camtasia
Comment:
Revision 8 as of 2010-01-07 18:49:22
Size: 1484
Editor: anderson-camtasia
Comment:
Deletions are marked like this. Additions are marked like this.
Line 31: Line 31:
Michael: Will email me information on the final cost of the summer internship.

Archaeology Database Development Meeting Notes


Jan 7, 2010

Present: Scot Anderson, Michael Hasel, Justo Morales

Topics Discussed:

Topics Reviewed: Work on database up to this point

  • Datamodel
  • Site/field information
  • Time investment
  • Earth Locus

Notes:

  1. Pottery Bucket Reading Information is not on one of the forms and will be different from what we have on MPP documentation.
  2. We discussed how to record elevations for pottery buckets separate from daily elevations for the locus. After discussion, Michael indicated that we did not need to collect intermediate elevations for the bucket. In the future this may change though.
  3. Noticed that "Location" should really be replaced by "Point Number" on several sections (This is an MPP change for new type of point collection).

We discussed some issues about the PhotoApplicationSpecifications - see the notes on that page.

The designation in the identification section should be a drop down that equates to what the locus actually "is". These are equivalent symbols in the levels section of MPP. Therefore the dropdown in the levels should be taken from here. This will be an item on the ProgramChangeRequests page.

Customer Todo Items

Justo: Will get me information for the pottery reading fields and the type by which the pottery is classified. Michael: Will email me information on the final cost of the summer internship.


ArchaeologyProject/MeetingNotes (last edited 2010-02-04 18:48:11 by anderson-camtasia)